Infra·Bridge Workmedium
Bridge Work — OR-58 — WILLAMETTE — Bridge work is occurring. Prepare to slow.
- Reported:
- Sep 23, 15:40 UTC
- Source:
- odot-construction
OR-58 — WILLAMETTE — Bridge work is occurring. Prepare to slow.
OR-58 — WILLAMETTE — Bridge work is occurring. Prepare to slow.
Free email alerts the next time an incident is reported in an area you watch — same sources as this page. Unsubscribe any time.
Locations may be approximate (block-level for media-sourced reports). For emergencies always defer to official authorities.